MSc Coursework: Engineering Economics
When should a contractor replace a working crane rather than keep maintaining it?
01
Heavy equipment like tower cranes sits at an uncomfortable intersection of engineering and finance: a crane can be technically functional for years past the point where keeping it is still the cheapest option. This study works through that decision formally, rather than by rule of thumb or gut feel about "how old is too old."
02
The analysis modelled a tower-crane replacement decision using a set of standard engineering-economics techniques applied together rather than in isolation:
Investment alternatives were evaluated under different interest-rate scenarios, since the "right" answer to a replacement question is rarely stable when financing conditions change.
03
Every one of these techniques is really a way of making a financial assumption explicit enough to argue with. This is the same discipline I now use on real machinery-investment decisions.
The defender-challenger logic in particular reappears constantly in construction: not just for cranes, but for any recurring "repair it again or replace it" decision, including, in a looser sense, decisions about whether to keep patching an existing workflow or invest in a new system. Treating that as a structured financial comparison rather than an intuition call is a habit this coursework project gave me before I needed it professionally.
04
Like the software-selection study, this was coursework, and its numbers were built around illustrative scenarios rather than a live fleet decision. What it built was fluency with a way of thinking: reading financial reasoning into a physical asset's life cycle. That fluency now sits underneath how I look at contractual risk and investment exposure in my current role, and underneath why I'm interested in how firms build the business case for digital tools in the first place.